
Originally Posted by
ClusterOne
We do pretty much what you do, one room at a time, one led light at a time. I run all my power supplies first then go back and start adding lights, then I don't need to drag an extension cord around. Besides it being a slow process, (but thats my fault, im very picky about lighting) I don't really have any problems when doing my lighting, thats one of the reasons I love using the little suckers!
I do like the idea of your battery powered tester, I will make sure to check you guys out at St Louis.
-Joel-